The Dholera masterplan by phase, ranked by planning area
Updated 11 November 2026. Compiled by the Dholera 2047 desk from the sources listed at the end of this page.
Phase I is the largest phase of the Dholera masterplan at 153.74 sq km (schemes TP1 and TP2), followed by Phase III at 142.08 sq km (TP5 and TP6) and Phase II at 126.60 sq km (TP3 and TP4). Together they cover 422.42 sq km of the planned 920 sq km. Areas are from the 2012 Final Development Plan.
The ranking
| Rank | Phase | Schemes | Planning area | Share of the six | Years |
|---|---|---|---|---|---|
| 1 | Phase I | TP 1 and 2 | 153.74 sq km | 36.4% | Reported target 2020 to 2025; the Development Plan summary in our record states no years |
| 2 | Phase III | TP 5 and 6 | 142.08 sq km | 33.6% | 2033 to 2042, per the sanctioned Development Plan profile |
| 3 | Phase II | TP 3 and 4 | 126.60 sq km | 30.0% | 2023 to 2032, per the sanctioned Development Plan profile |
| All six schemes | TP 1 to 6 | 422.42 sq km | 100.0% | Urban part of the plan, about 422 sq km |
Areas are the approximate scheme areas printed in the Final Development Plan sanctioned on 10 September 2012, added in code for each pair of schemes. Left out: part schemes 2/A, 4/A, which state no area. Data extracted 2026-08-04.
What the three phases are
The Development Plan splits the urban part of Dholera into three phases. Each phase is a pair of town planning schemes. Phase I holds the first two schemes, and TP2 holds the Activation Area of about 22.5 sq km where the first roads and utilities were built. Phase II holds TP3 and TP4. Phase III holds TP5 and TP6.
The phases are built in order. Phase II is listed for 2023 to 2032 and Phase III for 2033 to 2042 in the sanctioned plan profile. Those are planning periods, not delivery promises.
Where the 422 sq km sits inside 920 sq km
The three phases add up to 422.42 sq km, the urban part of the plan. The full region is described as about 920 sq km. The rest is coastal land, farmland and land outside any scheme. DICDL has reported that roughly a third of the developable land lies in the Coastal Regulation Zone, which limits what can be built there.
What fills the land
The plan reserves 11,000 hectares for industry, which is 110 sq km, and gives the Phase I industrial area as about 3,000 hectares gross. Industrial land parcels range from 0.5 to 150 hectares. The zoning percentage for each use is not stated in our record, so none is printed here.
How to use this when you look at a plot
- Find which scheme the plot is in, then look up its phase here.
- Check which phase has had roads, power and water built. For now that is Phase I, inside the Activation Area.
- Ask the seller for the scheme drawing and the final plot number, and check the GujRERA registration and title.
You can compare the phase with the map on this site's masterplan map page.
What this list cannot tell you
This list ranks planning areas from one 2012 table. It cannot tell you whether a phase is built, what any plot costs or when a phase will be delivered.
Questions people ask
How many phases does the Dholera masterplan have?
Three. Phase I covers town planning schemes 1 and 2, Phase II covers schemes 3 and 4, and Phase III covers schemes 5 and 6. Together they cover 422.42 sq km of the planned 920 sq km.
Which phase of Dholera is the largest?
Phase I at 153.74 sq km, about 36 per cent of the three phases. Phase III follows at 142.08 sq km and Phase II is the smallest at 126.60 sq km, based on the approximate areas in the 2012 Final Development Plan.
Which phase of Dholera is being built now?
Phase I. Its scheme TP2 holds the Activation Area of about 22.5 sq km where the first trunk roads and utilities were built. Later phases are planned to run from 2023 to 2032 and 2033 to 2042.
What does 920 sq km mean for Dholera?
It is the planned area of the region as the authority describes it. Only about 422 sq km is the urban part divided into the six schemes. The rest includes coastal and agricultural land.