Own a piece of India's city of 2047.
Dholera SIR is India's flagship greenfield smart city and one of the largest nodes of the Delhi Mumbai Industrial Corridor. This is the one place that lets you actually calculate, compare and verify a Dholera investment, instead of just reading a sales pitch. Every number is sourced and labelled.
Solid: standing on 11 Nov 2026.
Dashed: a published target, with its year.
2026 to 2047. Only the expressway and about 300 MW of solar stand today. Every dated target in our record sits between 2027 and 2042, and is drawn as an outline. No document sets a Dholera milestone for 2047.
- 920
- sq km planned region
- 109 km
- expressway, open Mar 2026
- Rs 91,000 cr
- Tata fab (reported)
- ~300 MW
- solar commissioned
Figures are sourced on each page. Reported and target values may change and are labelled as such.
What stands today, and what is still a target
The model above draws this list and nothing else. A year with no published target adds nothing.
- 2026Ahmedabad-Dholera Expressway, 109 kmStanding. Reported open 31 March 2026.
- 2026Solar park, about 300 MWStanding. Commissioned at 30 June 2026.
- 2026Tata semiconductor fabUnder construction. Drawn as a frame.
- 2026Dholera International AirportNot yet open. Officials said on 16 October 2026 it is expected to be operational by the end of 2026.
- 2027About 700 MW more solarTarget, March 2027. Under development. Our solar park page explains why this date can shift.
- 2028Tata fab commercial productionTarget, mid-2028. Ministry statement and company comment, reported in July 2026.
- 2028L&T Vyoma AI data centre, 250 MW statedTarget, around 2028. Agreement reported by All India Radio on 20 February 2026. Reports differ on the year.
- 2028Final assembly line for civil aircraftReported, around 2028. A memorandum of January 2026. Dholera was reported as the site in June 2026 and the companies have not confirmed it.
- 2029Gujarat target of 7.5 GW of data centre capacityState-wide target. Policy notified 7 August 2026. Nothing is drawn for Dholera.
- 2030Solar park at 5,000 MWTarget, around 2030. The long-range target. It is not capacity in operation.
- 2030-31Semi-high-speed rail, 134 kmTarget, up to 2030-31. Union Cabinet release of 13 May 2026.
- 2032Phase II planning period endsTarget, 2032. Schemes TP3 and TP4, 126 sq km, in the sanctioned Development Plan.
- 2040-42Full build-out of Phase IIITarget, about 2040 to 2042. Schemes TP5 and TP6, 142 sq km. Sources state both end years.
- 2043-47NothingNo Dholera plan, release or agreement in our record gives a milestone for 2047.
Every date is the newest a public source has stated, and dates have moved before. The full list with its sources: Dholera milestones from 2028 to 2042.
New in November 2026
- The Dholera masterplan by phase, ranked by planning area
- Dholera milestones from 2028 to 2042, by target date, and what the record says about 2047
- The 22 villages of the Dholera SIR, ranked by the area notified in 2009
- Dholera smart city completion date: what the plan says, and which targets have moved
- Dholera timeline: the key dated events from the 2009 notification to November 2026
- How big is Dholera SIR? The 920, 879, 580 and 422 sq km figures, and how much is allotted or built
- Viksit Gujarat 2047 targets: the economy, income, jobs and net zero goals Gujarat has published, labelled as targets
- Delhi Mumbai Industrial Corridor nodes: the nine projects and how far each has got, as on 31 May 2026
- Industrial corridors in India: the 11 corridor projects, the road or rail line each follows, and where each stands
- Bhimnath Dholera rail line: what is built, who builds it and the 2027 target
Calculate it. Do not just read about it.
Every other Dholera site talks about "10X returns" with no way to check. We built the calculators, the map and the comparator they only promise.
All tools- 01
ROI & growth projector
See what a plot could be worth across scenarios you control
- 02
EMI & loan calculator
Monthly instalment, interest and total on any plot budget
- 03
Appreciation modeller
Model price growth over 5, 10 and 20 years, transparently
- 04
Plot cost estimator
Rate x size plus stamp duty, registration and all-in cost
- 05
Stamp duty & registration
Gujarat 4.9% + 1% on any deal value, in one tap
- 06
Land unit converter
Bigha, vigha, sq yd, sq m, acre, hectare, all local units
- 07
Interactive masterplan map
Click activation zones, TP schemes and mega-projects
- 08
Compare developers
Side by side on rating, focus, area and track record
- 09
Find your plot quiz
Answer 6 questions, get a plot type that fits your goal
- 10
Due-diligence generator
Build a printable 15-point checklist for your exact plot
- 11
Ask Dholera AI
A sourced answer engine that never invents a number
- 12
Connectivity calculator
Distance and time to airport, expressway and Ahmedabad
Every mega-project, one board
Reported build status for the projects that decide Dholera's future.
Dholera Airport
BUILDING~80%Ops targeted Sept to Oct 2026 (reported Jul 2026)Tata Semiconductor Fab
BUILDING~50%Rs 91,000 cr, first chip target 2026-27Ahmedabad Expressway
OPERATIONAL100%109 km, reported open 31 Mar 2026Percentages are reported figures, as printed on each project page.
Start anywhere
The whole of Dholera, organised into clear domains.
Featured guides
The pages people search for most, answered plainly and sourced.
What Is Dholera SIR? The Complete, Sourced Explainer
Dholera SIR is the Dholera Special Investment Region, a roughly 920 sq km greenfield smart city
Read entry →- 02
Dholera International Airport: Status, Runway and Timeline
Dholera International Airport explained: the DIACL joint venture, a 3,200 m Code 4E runway, cont
- 03
Dholera Semiconductor Fab: Tata Electronics and PSMC, Explained
Sourced explainer on the Dholera semiconductor fab by Tata Electronics and PSMC: the Rs 91,000 c
- 04
Dholera Plot Prices: Why There Is No Fixed Rate and What Actually Drives It (2026)
How Dholera plot prices work in 2026: why there is no single fixed rate, the drivers that move i
- 05
Ahmedabad-Dholera Expressway: Route, Speed and Travel Time
The Ahmedabad-Dholera Expressway: a 109 km, four-lane, access-controlled NHAI road, 120 km/h des
- 06
Is Dholera Safe to Invest In? A Balanced Look at the Progress and the Risks (2026)
Is Dholera safe to invest in? A balanced 2026 view of the real progress, the early-stage risks,
Four short reports, written from the fact pack
Skip the sales calls. Download plain, sourced mini-guides: the NRI buying playbook, the first-timer checklist, the due-diligence kit and the Dholera 2047 outlook. Enter your email, get the PDF, no spam.
- Genuinely useful. Same sourced facts as the site, packaged to keep.
- No plot selling. We are a guide, not a broker.
Have a Dholera question? Get a sourced answer.
Our answer box replies only from our verified knowledge base and links to the guide it used. It never invents a number.
Open the tools